Hired as the Concreting Contractor, MAK Group were tasked with revamping the main entry to the Westmead Hospital. Construction requirements included a new main-entry roadway, concrete street furniture for patients and visitors, footpaths, seating, curved feature walls, and podium slabs that are not only functional, but aligned with the hospital’s overall design.